| 1 | Introduction: Importance and history of roads, transportation systems and classification of roads, definitions related to highways, Sustainable environment; ecology, global environmental problems and sustainability | Course notes prepared within the scope of relevant resources |
| 2 | Study of road route: Initial study, reconnaissance, preliminary project | Course notes prepared within the scope of relevant resources |
| 3 | Study of road route: Definitive study, distribution of project sub-sections | Course notes prepared within the scope of relevant resources |
| 4 | Study of road route: Zero polygon and research of alternative routes with the help of zero polygon | Course notes prepared within the scope of relevant resources |
| 5 | Determination and approval of the definite route | Course notes prepared within the scope of relevant resources |
| 6 | Coordinate calculations of the exact route, horizontal curve calculations, drawing of road route plans | Course notes prepared within the scope of relevant resources |
| 7 | Longitudinal and vertical curve calculations | Course notes prepared within the scope of relevant resources |
| 8 | Longitudinal section drawing, control and approval of red line on the longitudinal section. | Course notes prepared within the scope of relevant resources |
| 9 | Determination of vertical curve lengths, calculation of vertical curve project elevations | Course notes prepared within the scope of relevant resources |
| 10 | Approval of superelevation calculations and drawings | Course notes prepared within the scope of relevant resources |
| 11 | Cross-section calculations and control of cross-sectional area calculations | Course notes prepared within the scope of relevant resources |
| 12 | Volume calculations: Calculation of filling and cut volumes | Course notes prepared within the scope of relevant resources |
| 13 | Brückner calculations: Drawing of the Brückner epure and calculation of carrying moments | Course notes prepared within the scope of relevant resources |
| 14 | Delivery of the project file | |